Maintenance Dredging Foreshore Application 2014
-
1. Summary of Application
Size : 886 KB Added : 06/06/2014
-
10. Attachment D1 - Purpose of Loading Operations
Size : 24.8 KB Added : 06/06/2014
-
12. Attachment D3 - Details of Loading Operations
Size : 6.09 MB Added : 06/06/2014
-
13 Attachment E1 - Dump Site Selection
Size : 211 KB Added : 06/06/2014
-
14 Attachment E2 9i) - Characteristics of the Dumping Site
Size : 5.03 MB Added : 06/06/2014
-
16 Attachment F 1 1 Port of Cork Maintenance Dredging HDA Final
Size : 4.96 MB Added : 06/06/2014
-
17 Attachment F12 Synopsis & IHD Bathy Drawiings 1
Size : 7.91 MB Added : 06/06/2014
-
18 Attachment F13 Synopsis & IHD Bathy Drawings 2
Size : 5.01 MB Added : 06/06/2014
-
19 Attachment F14 POC Integrated Report (Mar 2013) & ASU
Size : 8.05 MB Added : 06/06/2014
-
20 Attachment F15 Van Oord Env Aspects of Cork Harbour
Size : 5.11 MB Added : 06/06/2014
-
21 G1 Monitoring Programme
Size : 19.8 KB Added : 06/06/2014
-
4 Attachment A7 - Current & Previous Permits
Size : 2.60 MB Added : 06/06/2014
-
5 Attachment B1 (i) - Material Analysis Forms, Sediment Sampling Locations and ASU Report
Size : 2.14 MB Added : 06/06/2014
-
6 Attachment B1 (ii) - Laboratory Reports
Size : 476 KB Added : 06/06/2014
-
7 Attachment B1 (iii) - Analysis of Results
Size : 70.5 KB Added : 06/06/2014
-
8. Attachment B2 - Characteristics and Composition of the Substance or Material for Disposal
Size : 10.0 MB Added : 06/06/2014
-
Application Form signed
Size : 3.14 MB Added : 06/06/2014
-
Company details
Size : 205 KB Added : 06/06/2014
-
Foreshore Licence Map
Size : 8.24 MB Added : 06/06/2014